Short answer: In Dallas–Fort Worth, building a custom concrete (gunite or shotcrete) pool usually takes about two to four months from signed design to first swim. Published DFW guidance puts actual construction at about 8 to 12 weeks once the permit is approved, and design and permitting add several weeks before any digging starts. Weather, inspections, HOA approval, soil conditions and how much decking and landscaping is included all move the date.
What are the phases of a pool build, and how long does each take?
Every builder sequences the work a little differently, but a custom concrete pool in North Texas goes through the same basic steps. The ranges below are typical market figures published by DFW pool builders and national home-services guides, not a promise for any single project.
| Phase | What happens | Typical published range |
|---|---|---|
| Design | Site visit, layout, features, equipment, budget | About 1–3 weeks |
| Permits and approvals | Engineering, utility sign-off, city permit, HOA approval | About 2–6 weeks, sometimes longer |
| Excavation | Layout, digging, hauling off soil | About 1–2 weeks |
| Steel and plumbing | Rebar cage, drains and pool plumbing; first city inspection | About 1–2 weeks |
| Gunite or shotcrete | The concrete shell is sprayed, then cures | About 1 week to spray, plus curing time |
| Electrical and gas | Equipment pad, bonding, lighting, heater lines | About 1 week |
| Tile, coping and decking | Waterline tile, coping and the deck around the pool | About 2–3 weeks |
| Interior finish and startup | Plaster, quartz or pebble finish, fill, equipment startup, final inspection | About 1–2 weeks |
Some phases overlap, and inspections sit between several of them, so the total is not simply the sum of the column.
Why do some pools take longer than others?
- Permits and HOA review. Some cities issue pool permits quickly and others take weeks. Many Collin County neighborhoods also require HOA architectural approval before work starts.
- Utility approval. Several North Texas cities require the electric utility to approve the pool plans before the permit is issued.
- Weather. Heavy rain floods an open excavation and delays concrete and plaster. Hard freezes can pause finish work.
- Soil and access. Expansive clay, rock, a slope or a pool close to the house can call for engineering, piers or retaining walls. A narrow side yard slows digging and hauling.
- Features. A spillover spa, sheer descents, a fire feature, an outdoor kitchen or a large deck all add trades and time.
- Inspection scheduling. Work cannot move to the next phase until the city passes the current inspection.
What do North Texas cities require before and during a pool build?
Rules differ by city, so check with your city’s building department before you plan a start date. Two examples from official city sources:
Richardson: The City of Richardson requires a permit for all pools, spas and hot tubs, with separate electrical and plumbing permits when that work is done. Oncor must approve the pool plans before the permit application, and a notarized certification for the required house-to-pool protection devices, signed by the homeowner, goes in with the application. A temporary fence must stay up from excavation until the permanent fence is installed, and the permanent fence must be at least 48 inches high with self-closing, self-latching gates. The permit must be approved and posted at the property before any work starts. (Source: City of Richardson Building Inspection.)
Frisco: The City of Frisco lists five pool inspections in order: belly steel and ground, gas/P-trap, deck steel, pre-plaster and pool final. Temporary safety fencing has to be in place before the first inspection, and permanent fencing and gates plus a pool protection device certification are required at the pre-plaster inspection. The drawings must carry the utility provider’s approval stamp. (Source: City of Frisco Residential Swimming Pools & Spas Submittal and Inspection Requirements.)
Your builder should handle the applications and inspections, but knowing the sequence helps you understand where the schedule can stall.
When should you start planning to swim by summer?
If you want to swim by late spring or early summer, fall and winter are the best time to design and permit. Starting the design in the cooler months leaves room for permitting, HOA review and weather delays before the spring rush. Our guide to 7 things to decide before you build walks through the decisions to make first.
Does the pool type change the timeline?
Yes. A concrete pool is built on site, so it takes longer than setting a factory-made fiberglass shell, but it can be any shape, size or depth. See gunite vs. shotcrete vs. fiberglass pools in North Texas for a side-by-side comparison.
How much does a custom pool cost?
Four Seasons custom pools start at $120,000. We don’t take shortcuts, and we build pools that last. Your final price depends on your yard, the features and how much decking and landscaping is included. Read more in our DFW pool cost guide.
How does Four Seasons build pools?
Four Seasons Lawn + Landscaping designs and builds custom pools together with the decking, outdoor living spaces, lighting, drainage and landscaping around them, so one team plans the whole backyard and sequences the trades. Licensed and insured, we have been building outdoor spaces in North Texas since 2001. Our office is in Murphy, minutes from Richardson, Plano, Wylie and Sachse. See our custom pool services or our pool pages for Plano, Frisco, Allen and Dallas.
Frequently asked questions
How long does it take to build an inground pool in Dallas–Fort Worth?
Published DFW guidance puts construction of a custom concrete pool at about 8 to 12 weeks once the permit is approved. With design and permitting, the whole process from first meeting to first swim is often two to four months.
How long does a pool permit take in North Texas?
It depends on the city. National guidance puts permits at about 2 to 6 weeks, but some cities move faster and some slower. Several North Texas cities also require the electric utility to approve the pool plans before the permit is issued, and HOA approval can add time.
What inspections does a pool need in Frisco?
The City of Frisco lists five inspections in order: belly steel and ground, gas/P-trap, deck steel, pre-plaster and pool final. Temporary safety fencing must be in place before the first inspection, and permanent fencing is required at pre-plaster.
Can I start building a pool before the permit is approved in Richardson?
No. The City of Richardson says the permit must be approved and posted at the property before any work begins, and Oncor must approve the pool plans before the permit application.
Is fall or winter a good time to start a pool in Texas?
Yes. Designing and permitting in fall and winter leaves time for approvals and weather delays, so the pool can be ready by late spring or early summer.
How much does a Four Seasons custom pool cost?
Four Seasons custom pools start at $120,000. The final price depends on your yard, the features you choose and how much decking and landscaping is included.
Plan your pool timeline with a designer
A designer can walk your yard, look at access and drainage, and map out a realistic schedule for your project. Call (214) 504-4250 (Mon–Fri, 8–5) or request a design consultation. Financing is available for qualified homeowners. You can also browse our FAQ.